Engineering that survives review
We would rather bring in a national laboratory or university partner early than discover a problem during diligence.
Active work with its current stage, stated without inflation. Detail on any item is shared under NDA with qualified counterparties.
The projects below reflect active discussions and programme work at their current stage. Status is intentionally precise.
Status reflects current stage. Items marked in structuring or early stage are under discussion and are not binding commitments. No item listed here represents executed financing, a construction contract or a regulatory approval. Detail on any listed item is available under NDA to qualified counterparties.
Projects reach us at different stages. What they have in common is a technical basis that holds up and a sponsor without a route to institutional capital.
We look at the technical basis, the sponsor, the offtake position and the regulatory path. If any one of those cannot be resolved, we say so early rather than late.
Work on the financing structure runs alongside the technical programme, not after it. Licensing pathway, siting and offtake are treated as design inputs.
Introductions and structuring support for sponsors holding assets or contracted cash flows but no route to a bank credit committee.
Investment Science LLC is affiliated with You Get Energy through common management. Capital formation work involving both entities is conducted on that basis and disclosed to counterparties.
Not every project is a fit. These are the conditions that make one workable, and their absence is usually the reason we decline.
We would rather bring in a national laboratory or university partner early than discover a problem during diligence.
A sponsor holding real assets, contracted cash flows or a defensible offtake position, rather than a concept seeking validation.
A licensing route that can be named and scheduled. For advanced reactors, the choice among NRC pathways including 10 CFR Part 53 is now a live strategic decision.
Remote industrial sites, defence installations and off-grid processing are where a transportable reactor earns its cost.
A schedule that reflects licensing and construction reality. Optimistic timelines do not survive contact with an allocator's technical adviser.
We hold ourselves to the same list. The status column above is written the way we would want a counterparty's pipeline written for us.
Bring us the technical basis, the sponsor position and the problem that needs solving.